| Boiler, FGD Ducts, Booster Fans and FF - Looking South |
| Boiler - Looking Southwest |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler - East Side |
| Boiler Area 2 Slab Concreting Works |
| Boiler - West Side |
| Steam Turbine Hall - Looking North |
| Steam Turbine Hall - Looking West |
| Steam Turbine Hall - Annex |
| Steam Turbine Hall-ST / GT Table - Looking South |
| Central Electrical Building - South Side |
| Central Electrical Building - 4m Level Central Electrical Building_MV Switchgear @ 4M Lvl |
| Central Electrical Building cable tray installation- 4m Level |
| Central Electrical Building - 16M Level |
| Central Electrical Building - 10M Level |
| Main Transformer Area- Looking East |
| Main Transformer Area - Main Transformer Rails |
| Boiler Electrical Building - Looking South |
| Fabric Filter - Looking Northeast |
| Cooling Water Pipe Saddle East Side of STH |
| SWFGD GRP Phase 3 and MCW Saddle |
| MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
| Reclaimation Works |
| Demin Water Tank Fdn Works |
| Service/Fire water storage tanks fdn works |
| FGD Electrical Building & Pipe Rack 4 Fdns |