| Boiler, FGD Ducts, Booster Fans and FF - Looking South |
| Boiler - Looking Southwest |
| Boiler Duct Work - East Side |
| Boiler - Looking Southeast |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler - Piping Installation Works |
![]() |
| Boiler - Scaffolding for LBC Cold reheat piping at 45M |
| Boiler Area - Passenger Hoist Erection |
| Steam Turbine Hall - Looking West |
| Steam Turbine Hall - Looking West |
| Steam Turbine Hall - Annex |
| Steam Turbine Hall - Looking East |
| Steam Turbine Hall-ST / GT Table - Looking North |
| Central Electrical Building - 0M Level |
| Central Electrical Building - 4M Level |
| 4 nos. of MV/LV Transformer lifted to CEB -4M level |
| 4 nos. of MV/LV Transformer lifted to CEB -4M level |
| Central Electrical Building - 4M Level Cable Tray Installation |
| Central Electrical Building - 16M Level |
| Main Transformer Area- Looking East |
| Boiler Electrical Building - Looking South |
| Demin Water Tank Fdn Works |
| Fabric Filter - Looking Northeast |
| Cooling Water Pipe Saddle East Side of STH |
| SWFGD GRP Phase 3 and MCW Saddle |
| MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
| Reclaimed Existing 5 yr Ash pond |
| Booster Fan, Absorbers and FGD Foundation - Looking South |
| Service/Fire water storage tanks fdn works |
| Demin Water Treatment Plant Fdn Works |
| Fly Ash Silo Fdn |
![]() |
| MP / LP / HP Piping Prefabrication |
![]() |
| MP / LP / HP Piping Prefabrication |