20.01.2012

Concreting To Pile #A94-800mm dia. -Absorbers Foundation -SinoHydro.

Boring To Pile #A27-800mm dia. -Absorbers Foundation -SinoHydro.

Fabric Filter -Curing In Progress -Grid 4 -Grid 6.

F2 -Foundation -Type A/B/C -Formwork Installation In Progress.

F1-Foundation -Boiler -West Side-Hacking Of Piles (4nos) In Progress.

F4 -Foundation -Type E -Preparation For Steel Fixing -Bottom Layer In Progress.

F2-Foundation -Type-F -Steel Reinforcement -Bottom Layer.

F3 -Foundation -Boiler -East Side -Concreting In Progress.

F11 -Foundation -Boiler -Excavation In Progress.

BOP -MCWS -Reclamation Area -Piling -Spun Pile -600mm dia. In Progress.

BOP -MCWS -Reclamation Area -Piling -Spun Pile 600mm dia. In Progress.

CEB -Preparation For Lean Concrete & Pile Hacking.

BOP -Intake Box Culvert -Fabrication In Progress -Murray Robert.

BOP -Intake Box Culvert -Fabrication In Progress.

BOP -Intake Box Culvert -Fabrication In Progress -Murray Robert.

Consortium Office -Alstom -Front View.

Consortium Office -Alstom.

Consortium Office -Alstom -Grd.Floor.

Consortium Office -Alstom -1st Floor.

Consortium Office -CMC/TNBJ/OE.

F2-Foundation -Type A/B/C -Final Inspection Prior Concreting -Boiler -East Side.

F2 -Foundation -Type A/B/C -Final Inspection Prior Concreting.

F2 -Foundation -Type A/B/C -Final Inspection Prior Concreting -Boiler -East Side.

No comments: