14.01.2012

Concreting To Pile #A70-1000mm dia. -Absorbers Foundation -SinoHydro.

Bunker/Mill -B5 -BB -Steel Fixing In Progress.

Turbine Hall -Excavation -2nd Stage -Down To Level -2.1MLSD.

Bunker/Mill -B5-BA -Installation Of Steel Reinforcement -Stump.

F3 -Boiler -East Side -Steel Reinforcement -Top Layer.

F7 -Boiler -East Side -Concreting In Progress.

Installation Of Steel Cage -Pile #A36-800mm dia. -Absorbers Foundation -EconPile.

F7 -Boiler -East Side -Concreting In Progress.

F2 Foundation Type F -Boiler -East Side -Preparation For Lean Concrete.

Hacking Of Piles -Ash Hopper.

Pile #A36-800mm dia. -Absorbers Foundation -Installation Of Vermiculite & Plug.

Concreting To Pile #A36-800mm dia. -Absorbers Foundation -EconPile.