19.01.2012

Installation -Steel Cage -Pile #HN56-1200mm dia. -Chimney -BOP -EconPile.

Boring To Pile #A23-800mm dia. -Absorbers Foundation -SinoHydro.

F4-Foundation -Type-E -Boiler -Hacking Of Piles In Progress.

F3 -Boiler -East Side -Ready For Final Inspection.

F2-Foundation Type F -Boiler -East Side -Preparation -Steel Fixing -Bottom Layer.

Removing Of Sheet Piles -Bunker/Mill -North Side -B17/B15.

Mill -D -Brickwall Formwork In Progress.

Final Inspection -F3 -Boiler -East Side -Prior Concreting.

Final Inspection -F3 -Boiler -East Side -Prior Concreting.

Concreting To Pile #HN56-1200mm dia. -Chimney -BOP. -EconPile.