15.12.2011

Weekly EHS ToolBox Meeting -Alstom/CMC/MCB/GIGA/SinoHydro/Murray Robert.

Final Preparation Prior Concreting -Type F3 Foundation -Boiler -West Side.

Final Preparation -Type F3 -Foundation -Boiler West Side -Prior Concreting.

Carting Away Of Debris (Hacked Piles) -Fabric Filter.

Excavation To Fabric Filter Area -North Side.

Hacking Of Piles -Fabric Filter Area.

Steel Fixing -Type 3 Foundation -Bunker/Mill -B11 -BB.

Steel Fixing -Type 2 Foundation -Bunker/Mill -B17-BB.

MLT -Chimney -Witnessed By OE/TNBJ.

BOP -MLT -Chimney -.

Pre-Pour Inspection By OE -Type F3 Foundation -Boiler -West Side.

BOP -Coal Yard -Preparation For Test Pile (Spun Pile).