Steel Reinforcement Preparation -Bunker/Mill -Type2/Type 3 Foundations.
Bunker/Mill -Lean Concrete Completed -Grid:B11 -B3 -BA-BB.
Installation Of Formwork -Type F3 -Foundation -Boiler -West Side.
Type F6 -Boiler -West Side -Curing In Progress.
Bund Preparation -Dewatering System -Fabric Filter -South Side.
Bund Preparation -Dewatering System -Fabric Filter.(North Side).
PDA -Pile #T162-1000mm dia. -Turbine Hall.
PDA -Pile #T162 -1000mm dia. -Turbine Hall -SynoHidro.
Installation Of Thermal Monitoring System -Type F3 -Foundation -Boiler -West Side.
Inspection By OE -Thermal Monitoring System -Type F3 Foundation -Boiler -West Side.
Inspection & Testing Of Thermal Monitoring System -Type F3 Foundation -Boiler-West Side.
BOP -Chimney -Preparation For MLT.