12.12.2011

Steel Reinforcement Preparation -Bunker/Mill -Type2/Type 3 Foundations.

Bunker/Mill -Lean Concrete Completed -Grid:B11 -B3 -BA-BB.

Installation Of Formwork -Type F3 -Foundation -Boiler -West Side.

Type F6 -Boiler -West Side -Curing In Progress.

Bund Preparation -Dewatering System -Fabric Filter -South Side.

Bund Preparation -Dewatering System -Fabric Filter.(North Side).

PDA -Pile #T162-1000mm dia. -Turbine Hall.

PDA -Pile #T162 -1000mm dia. -Turbine Hall -SynoHidro.

Installation Of Thermal Monitoring System -Type F3 -Foundation -Boiler -West Side.

Inspection By OE -Thermal Monitoring System -Type F3 Foundation -Boiler -West Side.

Inspection & Testing Of Thermal Monitoring System -Type F3 Foundation -Boiler-West Side.

BOP -Chimney -Preparation For MLT.