BOP -Steel Reinforcement Fabrication Yard -P.C Box Culvert -Water Intake -Murray Robert.
BOP -Fabrication Yard Preparation -P.C Box Culvert -Water Intake -Murray Robert.
BOP -Water Intake -Preparation For P.C Box Culvert Fabrication Yard -Murray Robert.
Final Preparation Prior Concreting -F3 Foundation -Boiler -West Side.
Delivery Of Steel Reinforcement -Fabric Filter Area.
Steel Fixing -Type 2 Foundation -Bunker/Mill -B13-BA.
Inspection -By OE/TNBJ -Steel Reinforcement -Type 2 Foundation -Bunker/Mill -B17-BA -BB.
Concreting -F3 Foundation -Boiler -West Side.
Concreting F3 Foundation -Boiler -West Side -545m3.
Concreting F3 Foundation -Boiler -West Side -545m3.
Concreting -F3 Foundation -Boiler -West Side -545m3.
Taking Data -Thermal Monitoring System -F3 -Foundation -Boiler -West Side -Concreting.
F2 Foundation -Boiler -East Side -Preparation For Dewatering & Lean Concrete.