BOP -Steel Reinforcement Fabrication Yard -P.C Box Culvert -Water Intake -Murray Robert.

BOP -Fabrication Yard Preparation -P.C Box Culvert -Water Intake -Murray Robert.

BOP -Water Intake -Preparation For P.C Box Culvert Fabrication Yard -Murray Robert.

Final Preparation Prior Concreting -F3 Foundation -Boiler -West Side.

Delivery Of Steel Reinforcement -Fabric Filter Area.

Steel Fixing -Type 2 Foundation -Bunker/Mill -B13-BA.

Inspection -By OE/TNBJ -Steel Reinforcement -Type 2 Foundation -Bunker/Mill -B17-BA -BB.

Concreting -F3 Foundation -Boiler -West Side.

Concreting F3 Foundation -Boiler -West Side -545m3.

Concreting F3 Foundation -Boiler -West Side -545m3.

Concreting -F3 Foundation -Boiler -West Side -545m3.

Taking Data -Thermal Monitoring System -F3 -Foundation -Boiler -West Side -Concreting.

F2 Foundation -Boiler -East Side -Preparation For Dewatering & Lean Concrete.