Fabric Filter -Preparation For Lean Concreting.
Fabric Filter -Preparation For Lean Concrete & Dewatering System -South Side.
Type F6 -Foundation -Boiler-West Side -Steel Reinforcement Completed.
Type F6 -Foundation -Boiler -West Side-Final Cleaning Prior Concreting.
Carting Away Of Debris (Hacked Piles) -Bunker/Mill.
Cleaning Of Debris(Hacked Piles) -Bunker/Mill.
Bunker/Mill -B11-B3 -Preparation For Lean Concrete.
Type F3 -Foundation -Boiler -West Side -Steel Reinforcement -Top Layer.
Type F3 -Foundation -Boiler -West Side -Steel Fixing -Top Layer-In Progress.
Fabric Filter -Bund Preparation For Dewatering System -South Side.
Fabric Filter -Bund Preparation For Dewatering System.(South Side).
Bunker/Mill -B11-B3 -Preparation For Lean Concrete.