03.04.2012

APS, CMC & MUDAJAYA-Keep on Track with their Plan forCommencement of Casting of Steam Turbine Hall Base Raft Foundation.
Commencement  Day of Casting of Steam Turbine Hall Base Raft Foundation.
 Makeshift Tent for the Casting of Steam Turbine Hall Base Raft Foundation.
 Turbine Hall-Position of Three (3) Concrete Pump Truck for the Casting of Base Raft Foundation.
 Turbine Hall- Final Preparation Prior for Concreting
  Turbine Hall- Final Preparation Prior for Concreting

 Turbine Hall- First Concrete Pump Truck Casting Started at the southwest corner.
 Turbine Hall-On Call Concrete Mixer Truck
  Turbine Hall- Casting of Concrete in Progress
 Turbine Hall- Casting of Concrete in Progress
 Turbine Hall- Casting of Concrete in Progress

 Turbine Hall-2nd Concrete Pump is Set to Cast Concrete
  Turbine Hall-2nd Concrete Pump is Set to Cast Concrete
  Turbine Hall-2nd Concrete Pump Truck Casting Started at the NorthwestCorner
   Turbine Hall-2nd Concrete Pump Truck Casting in Progress
 Turbine Hall-3rd Concrete Pump Truck Setting up
 Turbine Hall-Access to 3rd Concrete Pump Truck
 Checking the Delivery of Concrete
 Taking Sample of Concrete

  Taking the Slump Test of the Concrete

 Boiler-Heap of Sand for Backfilling
 F5-Boiler-Steel Fixing of Stumps in Progress
 F1-Boiler-Formworks Installation of Stumps in Progress
F4-Boiler- Formworks Installation of Base Foundation in Progress
 F9-Boiler-Formworks Installation of Base Foundation in Progress
 F11-Boiler-Formworks Installation of Base Foundation in Progress
  F10-Boiler-Formworks Installation of Stumps in Progress
 Turbine Hall-Box Tie in Excavation in Progress
 Chimney-Steel Fixing Bottom Bars for Base Foundation in Progress
 Condensate Pump Pit-Backfilling and Compaction in Progress
 Central Electrical Building-Preparation of Lean Concreting in Progress
  Central Electrical Building-Steel Fixing of Base Foundation in Progress
Phase 1-Main Cooling Water-Final Preparation Prior for Lean Concreting
 Phase 1-Fuel Gas Desulfurization Glass Reinforced Pipes-Backfilling in Progress
 Turbine Hall-Box Tie in Excavation in Progress
 Boiler-Eversendai-Delivery of Main Steel Column to Site
Eversendai-Stacking of Main Steel Column at the East Side of the Boiler
 Eversendai-Site Office Construction