Boring To Pile #A44 -1000mm dia -Absorbers Foundation -EconPile.

Fabric -Filter -Preparation Prior Concreting.

F1 -Boiler -West Side -Formwork Completed.

F3 -Boiler -West Side -Formwork Installation -Stump.

F3 -Boiler -West Side -Formwork For Stump.

F3 -Boiler -East Side -Carting Away Of Debris (Hacked Piles).

Steel Cutting & Bending -Bunker/Mill.

Bunker/Mill -B1-BA -Steel Fixing -Type 2 Foundation.

CCB -Excavation In Progress.

Turbine Hall -Excavation-1st Stage In Progress.

Turbine Hall -Excavation -1st Stage In Progress.

Bunker/Mill -B1-BA -Steel Fixing -Foundation Type 2.

FDT -Bunker/Mill -B15 -4th Layer.

Bore Rigs -SinoHydro -Mobilized To Absorbers Area -Preparation To Commence.

BOP -Sub-Station -Project Power Supply -Re-Bar Preparation -Base Slab & Beams.

Installation Of Casing -Pile #A13 -1000mm dia -Absorbers Foundation -SinoHydro.

Concreting To Pile #A41 -800mm dia. -Absorbers Foundation -EconPile.

F1 -Boiler -West Side -Preparation To Install Re-Bar For Stumps.

F3/F6 -Boiler -West Side -Removing Of Sheet Piles (Coffer Dam).

F3/F6 -Boiler -West Side -Backfilling -7th Layer In Progress.