Fabric -Filter -Preparation Prior Concreting.
F1 -Boiler -West Side -Formwork Completed.
F3 -Boiler -West Side -Formwork Installation -Stump.
F3 -Boiler -West Side -Formwork For Stump.
F3 -Boiler -East Side -Carting Away Of Debris (Hacked Piles).
Steel Cutting & Bending -Bunker/Mill.
Bunker/Mill -B1-BA -Steel Fixing -Type 2 Foundation.
CCB -Excavation In Progress.
Turbine Hall -Excavation-1st Stage In Progress.
Turbine Hall -Excavation -1st Stage In Progress.
Bunker/Mill -B1-BA -Steel Fixing -Foundation Type 2.