Boring To Pile #A49-800mm dia. -Absorber Foundation -EconPile.
Fabric Filter -Formwork Installation -Tie Beams.
Crushing Of Piles -F1 -EconPile.
F1 -Foundation -Boiler -East Side -Steel Reinforcement -Top Layer.
F3/F6 -Boiler -West Side -Removing Of Sheet piles (Coffer Dam).
F3/F6 -Boiler East Side -Inspection Of Pile Heads Preparation.
Pile #A49-800mm dia. -Absorber Foundation -Installation Of Steel Cage -EconPile.
Boring To Pile #A87-1000mm dia. -Absorber Foundation -EconPile.
BOP -MCWS -Preparation To Commence With Piling Works -Spun Pile -600mm dia.
BOP -MCWS -Preparation To Commence With Piling Works -Spun Pile 600mm dia.
BOP -MCWS -Backfilling In Progress.