26.12.2011

Consortium Office.

Steel Cages -Preparation -Chimney -BOP -EconPile.

F2 Foundation -Boiler -East Side -Steel Reinforcement Completed.

F2 Foundation -Boiler -East Side -Steel Reinforcement Completed.

Steel Fixing -Stump -Type 3A Foundation -B13-BB -Bunker/Mill.

Concreting To Pile # QA17 -1000mm dia. -CWP -Turbine Hall -BOP -Sinohydro.

Steel Fixing -Stump -Type 2 Foundation -B17 -BA -Bunker/Mill.

Steel Fixing -Type 3 Foundation -B9 -BA -Bunker/Mill.

Pile # A04 -BUnker/Mill -Type 2 Foundation -B3-BB -Brickwall Formwork.

Concreting To Pile #A10 -800mm dia. -Slag Conveyor.