Fabric Filter -Installation Of Steel Reinforcement & Formwork -Pile Caps.
Fabric Filter -Installation Of Steel Reinforcement & Formwork -Pile Caps.
Steel Fixing -F2 Foundation -Boiler -East Side.
F1 -Foundation -Boiler -West Side- Excavation To Formation Level.
Sheet Piling -(Coffer Dam) -F3/F6 -Foundation -Boiler -East Side.
Concreting To Pile #A04-800mm dia. -Slag Conveyor -SinoHydro.
Bunker/Mill -Installation Of Formwork/Re-Bar For Stumps -B17-B13-BA/BB.
Installation Of Steel Reinforcement -Type 3 Foundation -Bunker/Mill -B11-BA.
MLT -Pile #T282-1000mm dia. -Turbine Hall -SynoHydro.