Weekly EHS Tool Box Briefing -ALSTOM/CMC/MCB/GIGA/SINOHYDRO/MURRAY ROBERT/ECONPILE.

Boring To Pile # HN41-1200mm dia. -Chimney -BOP -EconPile.

Excavation To Fabric Filter Area.

Fabric Filter -Installation Of Steel Reinforcement -Pile Cap.

Sheet Piling -Coffer Dam -F1 Foundation -Boiler -West Side.

F3 Foundation -Boiler -West Side -Curing In Progress.

Installation Of Formwork -Bunker/Mill -B17 -B13 -BA-BB.

Inspection Of Steel Cages -Slag Conveyor -800mm dia. -SinoHydro.

PIT -Pile #T247 -1000mm dia. -Turbine Hall.

Preparation For MLT -Pile #T282 -1000mm dia. -Turbine Hall -SinoHydro.

BOP -MCWS -Backfilling In Progress.

Tower Crane Parts -To Be Installed & Utilized @ Turbine Hall.

BOP -Coal Yard -North Side -Preparation For MLT.

BOP -Chimney -Installation Of Steel Cage -Pile #HN41-1200mm dia. -EconPile.

Fabric Filter -Installation Of Steel Reinforcement -Pile Caps.

F1 Foundation -Boiler -West Side -Excavation In Progress.