Boring To Pile #HN21-1200mm dia. -Chimney-BOP -EconPile.
FGD -Pipes Route -Soil Improvement -Spun Pile-600mm dia -Preparation Works.
Pile #A23-800mm dia -Absorber Foundation -Preparation For PDA Test.
Mill-H -Installation Of Formwork.
Turbine Hall -Condensate Sump Pit.
F1-Type-F -Boiler -West Side -Inspection Of Steel Reinforcement -Stump.
Bunker/Mill -Pedestal-B17/BB-Curing In Progress.
Bunker/Mill -Pedestal -B15/BB -Final Inspection Prior Concreting.
F3-Boiler -West Side -Stumps -Final Inspection Of Positioning & Elevation Prior Casting.
F3-Boiler -West Side -Stump-Final Inspection Of Positioning Prior Concreting.