Mill-H -Adjusting And Leveling Of J-Bolts In Progress.
Mill-H -Setting And Leveling Of J-Bolts In Progress.
F3-Boiler -West Side -Stump -Inspection Of J-Bolts Positioning.
F3 -Boiler-West Side -Stump -Inspection Of J-Bolts Positioning.
Pile #HN18 -1200mm dia. -Installation Of Steel Cage -Chimney-BOP -SinoHydro.
Spun Piles-400mm dia. -FGD -Pipes -Soil Improvement.
Piling Rig -Preparation For 400mm dia. -Spun Pile -FGD -Pipes -Soil Improvement.
F4 -Type D -Boiler -West Side -Installation Of Formwork.
F11-B14 -Boiler -East Side -Final Inspection Prior Casting.
Turbine Hall -Level (-3.6MLSD).
Turbine Hall -Grid 9 -Grid 8 -B/D -(-3.6MLSD) -Carting Away Of Hacked Piles.
Turbine Hall -Grid 5 -Grid -4 -B/D -(-3.6MLSD) -Preparation For Lean Concrete.
F11 -B14 -Boiler -East Side -Concreting In Progress.