06.02.2012

Boring To Pile #HN25 -1200mm dia. -Chimney -BOP -EconPile.

F2-Type-F -Boiler -East Side -Curing In Progress.

F4-Type E -Boiler -Curing In Progress.

F4-Type-D -Preparation For Pile Hacking.

F4-Type A -Boiler -West Side -Hacking Of Piles Completed.

Hacking Of Piles -F4 -Type D -Boiler -West Side.

F11-B14 -Boiler -East Side -Steel Fixing -Bottom Layer.

Turbine Hall -Preparation For 3rd Stage Excavation (-3.6MLSD).

Turbine Hall -Preparation For 3rd Stage Excavation -(-3.6MLSD).

Turbine Hall -Installation Of I-Beam -Support (Bracing) To Sheet Piles -(Coffer Dam) -South.

Turbine Hall -Installation Of I-Beam Support (Bracing) To Sheet Piles -(Coffer Dam)-South.