Boring To Pile #HN48-1200mm dia. -Chimney -BOP -EconPile.
Boring To Pile #B03-800mm dia. -Booster Fan -SinoHydro.
F2 -Foundation -Type A/B/C -Boiler -East Side -Steel Fixing -Tie Beams In Progress.
Mill -H -J-Bolts Frame -Setting Up In Progress.
F11-Foundation -Boiler -Hacking Of Piles (12 nos).
Steel Cage Installation -Pile #HN48-1200mm dia. -Chimney -BOP -EconPile.
Concreting -Pile #B03 -800mm dia. -Booster Fan -SinoHydro.
F2-Type A/B/C -Boiler -East Side -Steel Fixing -Tie Beam In Progress.
F3-Boiler -East Side -Compaction (Backfilling Works) In Progress.(4th Layer).
F2-Type-F -Boiler -East Side -Final Inspection Prior Concreting.