31.01.2012

BOP -Intake Box Culvert -Coffer Dam In Progress.

BOP -Intake Box Culvert -Preparation Works In Progress.

BOP -Intake Box Culvert -Excavation To Shore Protection.

Boring To Pile #HN27 -1200mm dia. -Chimney -BOP -EconPile.

Boring To Pile#B02-800mm dia. -Booster Fan -SinoHydro.

Fabric Filter -Steel Fixing & Formwork Installation -Gridline 6 -Gridline 8.

F2-Type -F -Final Preparation In Progress -Prior Concreting.

F7/F3 -Boiler -East Side -Backfilling-1st Layer In Progress.

F7/F3 -Foundation -Boiler -East Side -Backfilling -1st Layer In Progress.

F11 -Foundation -Boiler -Preparation For Lean Concreting.

J-Bolts -Frames -Mill -H -Preparation In Progress.

Mill -H -Preparation To Intsall-I-Beam Support For -J-Bolts -Frame.

F2-Type-F -Boiler -East Side -Pre-Pour Inspection.

F2 -Type-F -Boiler -East Side -Pre-Pour Inspection.

No comments: