19.11.2011

Hacking Of Piles -Type F3 -Foundation -Boiler -West Side -Pile #B39 -1200mm dia.

Inspection Of Steel Reinforcement -Bunker/Mill -Foundation -1st Phase Pour -B9.

Inspection Of Steel Reinforcement -Bunker/Mill -Foundation -1st Phase Pour -B9.

Bar Bending -Bunker/Mill -Foundation -1st Phase Pour -B13/B15.

Fabric Filter Area .

Installation Of Treme Pipes -Pile #T275 -1000mm dia. -Turbine Hall -SinoHydro.

Boring To Pile #T102-1000mm dia. -Turbine Hall -SinoHydro.

Installation Of Formwork -Bunker/Mill -Foundation -1st Phase Pour -B9.

Compaction -Backfilling Works -Upto Level EL-1.00 -Bunker/Mill -Foundation -B1-B7.


Steel Fixing -Bunker/Mill -1st Phase Pour -Foundation -B11.