24.12.2011

Fabric Filter -Installation Of Steel Reinforcement & Formwork -Pile Caps.

Fabric Filter -Installation Of Steel Reinforcement & Formwork -Pile Caps.

Steel Fixing -F2 Foundation -Boiler -East Side.

F1 -Foundation -Boiler -West Side- Excavation To Formation Level.

Sheet Piling -(Coffer Dam) -F3/F6 -Foundation -Boiler -East Side.

Concreting To Pile #A04-800mm dia. -Slag Conveyor -SinoHydro.

Bunker/Mill -Installation Of Formwork/Re-Bar For Stumps -B17-B13-BA/BB.

Installation Of Steel Reinforcement -Type 3 Foundation -Bunker/Mill -B11-BA.

MLT -Pile #T282-1000mm dia. -Turbine Hall -SynoHydro.

23.12.2011

Fabric Filter -Trimming Of Pile Heads.

Fabric Filter -Installation Of Formwork -Pile Caps.

Fabric Filter -Installation Of Steel Reinforcement -Pile Caps.

F1 Foundation -Boiler -West Side -Excavation In Progress.

F3 -Boiler -East Side -Curing In Progress.

Sheet Piling (Coffer Dam) -F3/F6 -Foundation -Boiler -East Side.

Formwork -Bunker/Mill -B17 -B13 -BA/BB -Scheduled For Concreting On 27.12.2011

Installation Of Treme Pipes -Pile # A01 -800mm dia. -Slag Conveyor.

Trimming To Pile Heads -Bunker/Mill.

MLT -Pile #T282 -1000mm dia. -Turbine Hall.

22.12.2011

Weekly EHS Tool Box Briefing -ALSTOM/CMC/MCB/GIGA/SINOHYDRO/MURRAY ROBERT/ECONPILE.

Boring To Pile # HN41-1200mm dia. -Chimney -BOP -EconPile.

Excavation To Fabric Filter Area.

Fabric Filter -Installation Of Steel Reinforcement -Pile Cap.

Sheet Piling -Coffer Dam -F1 Foundation -Boiler -West Side.

F3 Foundation -Boiler -West Side -Curing In Progress.

Installation Of Formwork -Bunker/Mill -B17 -B13 -BA-BB.

Inspection Of Steel Cages -Slag Conveyor -800mm dia. -SinoHydro.

PIT -Pile #T247 -1000mm dia. -Turbine Hall.

Preparation For MLT -Pile #T282 -1000mm dia. -Turbine Hall -SinoHydro.

BOP -MCWS -Backfilling In Progress.

Tower Crane Parts -To Be Installed & Utilized @ Turbine Hall.

BOP -Coal Yard -North Side -Preparation For MLT.

BOP -Chimney -Installation Of Steel Cage -Pile #HN41-1200mm dia. -EconPile.

Fabric Filter -Installation Of Steel Reinforcement -Pile Caps.

F1 Foundation -Boiler -West Side -Excavation In Progress.

21.12.2011

Consortium Office -Alstom -1st Floor.

Consortium Office -Alstom -Grd.Floor.

Fabric Filter -Hacking Of Piles.

Sheet Piling -Coffer Dam -F1 Foundation -Boiler -West Side.

Preparation For MLT -Pile #T282 -1000mm dia. -Turbine Hall.

Steel Reinforcement -Bunker/Mill -B13 -Type 3A -BA-BB.

Bunker/Mill -Installation Of Formwork -B17-B13 -BA.


BOP -Water Intake/Offshore -Preparation -Casting Yard -Box Culvert -Murray Robert.

BOP -Water Intake/Offshore -Preparation -Casting Yard -Box Culvert -Murray Robert.

BOP -Chimney -Preparation To Commence Boring -Pile #HN41-1200mm dia. -EconPile.

20.12.2011

PIT -Fabric Filter -25points.

Steel Reinforcement -Foundations -Fabric Filter.

Steel Fixing -Tie Beam -Bunker/Mill -B15 -B13 -BB.

Installation Of Formwork -Tie Beam -Bunker/Mill -B17 -B15 -BB.

Chipping & Cleaning -Surface Preparation -Construction Joint -Bunker/Mill -1st Phase Foundation.

Delivery Of Sheet Piles -Preparation For Coffer Dam -F3/F6 -Boiler -East Side.

Dismantling Of Formwork -F6 Foundation -Boiler -West Side.

Dismantling Of Formwork -F6 Foundation -Boiler -West Side.

Applying Of Curing Compound -F6 Foundation -Boiler -West Side.

PDA Test -Pile # A22 -800mm dia. -Fabric Filter.