| Boiler, FGD Ducts, Booster Fans and FF - Looking Southeast |
| Boiler - Looking Southwest |
| Boiler - Looking Northeast |
| Boiler - Looking West |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler - Area 2 |
| Steam Turbine Hall (East Side) |
| Steam Turbine Hall Crane Load Test |
| Steam Turbine Looking Northwest |
| Steam Turbine Hall-ST / GT Table |
| CEB - Looking Souteast |
| CEB - Cable Pulling Started - 0m level |
| MV Switchgear CEB - 4m level |
| MV Switchgear CEB - 4m level |
| Blockwork CEB - 16m level |
| Main Transformer Area - GSUT#1 to #4 |
| Main Transformer Area - GSUT#1 to #4 |
| SWFGD GRP Phase 3 and MCW Saddle |
| SWFGD GRP and MCW North of New HV Line (North end) |
| MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
| Service/Fire water storage tanks fdn works |
| FGD Area - Looking South |