| Boiler - Lookin Southeast |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler - Looking at 0m lvl |
| Boiler-Pressure Parts Walls |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler - 100m Lvl |
| Boiler-Pressure Parts Wall and Pipe Headers (East Side) |
| Boiler - Area 2 |
| Steam Turbine Hall (East Side) - Concreting of ST / GT Table in Progress |
| Steam Turbine Hall (West Side) - Concreting of ST / GT Table in Progress |
| Steam Turbine Hall - ST / GT Table Concreting 1st Lift |
| Steam Turbine Hall - ST / GT Table at Sunrise |
| Steam Turbine Hall - ST / GT Table Panographic view |
| CEB - Cable Pulling Started - 0m level |
| MV Switchgear CEB - 4m level |
| Main Transformer Area - Arrival of Unit Transformer |
| Main Transformer Area - Arrival of Unit Transformer |
| Boiler Electrical Building |
| Fabric Filter South Side |
| Cooling Water/ Seawater Pipelines at overhead line area |
| Aeration basin area |
| FGD Pipe Rack 4 and FGD Electrical Building Fdns |
| Service/Fire water storage tanks fdn works |
| FGD Area - Looking South |
| Land reclaimation works |