| Boiler, FGD Ducts, Booster Fans and FF - Looking Southeast |
| Boiler - Looking Southwest |
| Boiler - Looking East |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Steam Turbine Hall (East Side) |
| Steam Turbine Looking Northwest |
| Steam Turbine Hall (South Side) |
| Main Transformer Area - GSUT#1 to #4 |
| CEB - Cable Pulling Started - 0m level |
| MV Switchgear CEB - 4m level |
| Main Transformer Area - Electrical duct works |
| Main Transformer Area |
| Boiler Electrical Building |
| Fabric Filter South Side |
| MCW and MCW Saddle at SWFGD GRP Phase 3 |
| MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
| FGD Area - Looking South |
| FGD Area - Booster Fans |