Mill-E -Installation Of Formwork.

Turbine Hall -Grid 3 -Grid 2 -B-D -Lean Concreting.

Turbine Hall -Re-Bar Inspection -Bottom Layer -B1/B2 -Raft Foundation.

Turbine Hall -Re-Bar Inspection -Bottom Layer-B1/B2 -Raft Foundation.

F1-Type -A/B/C -Preparation For Lean Concrete & Pile Hacking.

Final Inspection -J-Bolts -F1-Type F -Boiler -West Side.

Joint Inspection -J-Bolts -F1-Type F -Boiler -West Side.