Chimney -Dewatering In Progress -Preparation For Lean Concrete.
Mill-E -Installation Of Formwork.
Waste Water Pit -Lean Concrete -Preparation For Base Slab.
F1-Type F-Boiler -West Side -Concreting To Stumps.
F1-Type A/B/C -Boiler -West Side -Preparation For Lean Concrete /Pile Hacking.
Turbine Hall -Steel Fixing -Top Layer -Raft Foundation.
Turbine Hall -Steel Fixing -Top Layer -Raft Foundation.
Turbine Hall -Condensate Pit -Excavation In Progress.
Mill-E -Installation Of Formwork.
Mill-E -Adjustment To J-Bolts.