Boring To Pile #A40-800mm dia. -Absorbers Foundation -EconPile.
Fabric Filter -Hacking Of Piles -Grid -7 To Grid-8.
Mill -G -Steel Reinforcement -2nd Stage Pour In Progress.
Turbine Hall -Excavation 2nd Stage In Progress -Down To Level -2.1MLSD (CWP Pipes Line).
Turbine Hall -2nd Stage Excavation -Down To Level -2.1MLSD In Progress. (CWP -Pipe Lines).
Bunker/Mill -B5 -BA/BB -Steel Fixing In Progress.
J-Bolt Frame -Mill -H -Preparation In Progress.
J-Bolt -Frame -Mill -H -Preparation In Progress.
Mill -H -Steel Fixing -2nd Stage Pour.
F7 -Boiler -East Side -Installation Of Formwork In Progress.
Spraying Of Curing Compound -F1 -Type F -Foundation -Boiler -West Side.
F3 -Boiler -East Side -Inspection Of Steel Reinforcement -Bottom Layer.
F3 -Boiler -East Side -InspectionOf Steel Reinforcement -Bottom Layer.
Brickwall Formwork -Mill -H -Preparation For 2nd Stage Pour -Bunker/Mill.
Concreting To Pile #A68-1000mm dia. -Absorbers Foundation -SinoHydro.
Concreting To Pile #A48-800mm dia. -Absorbers Foundation -EconPile.