Mill-H.
Joint Inspection -J-Bolts -Positioning & Elevation -F7 -Stumps.
F4-Type A -Boiler -West Side -Curing In Progress.
Mill-Pedestal -B7-BB -Formwork Installation.
Mill-Pedestal -B1-BB -Steel Fixing In Progress.
Turbine Hall -Raft Foundation -Grid9 -Grid 3 -B-D -Steel Fixing -Bottom Layer.
Turbine Hall -Raft Foundation -Steel Fixing -Bottom Layer.(-3.6MLSD).
Turbine Hall -Raft Foundation -Steel Fixing -Bottom Layer (-3.6MLSD).
Chimney -BOP -Excavation In Progress.
Mill-Pedestal -B13-BB -Ready For Concreting.
Mill Pedestal -B11-BB -Final Inspection Prior Concreting.
MILL-G -Final Preparation Prior Concreting.
MILL-G -Final Preparation Prior Concreting.
Chimney -BOP -Excavation -Preparation For Lean Concrete In Progress.