01.03.2012

Mill-H.

Joint Inspection -J-Bolts -Positioning & Elevation -F7 -Stumps.

F4-Type A -Boiler -West Side -Curing In Progress.

Mill-Pedestal -B7-BB -Formwork Installation.

Mill-Pedestal -B1-BB -Steel Fixing In Progress.

Turbine Hall -Raft Foundation -Grid9 -Grid 3 -B-D -Steel Fixing -Bottom Layer.

Turbine Hall -Raft Foundation -Steel Fixing -Bottom Layer.(-3.6MLSD).

Turbine Hall -Raft Foundation -Steel Fixing -Bottom Layer (-3.6MLSD).

Chimney -BOP -Excavation In Progress.

Mill-Pedestal -B13-BB -Ready For Concreting.

Mill Pedestal -B11-BB -Final Inspection Prior Concreting.

MILL-G -Final Preparation Prior Concreting.

MILL-G -Final Preparation Prior Concreting.

Chimney -BOP -Excavation -Preparation For Lean Concrete In Progress.