23.02.2012

 Boiler Foundation - preparation of pedestal pour. 
 Turbine Hall Foundation - Cleaning & Dewatering for Reinforcement
 Boiler Foundation Type F10 (East) - Formwork installation
 Boiler Foundation Type F4 (East 1/2) - Final Preparations for Concreting
 Boiler Bunker Steel Structure Pedestals (Mill H South-West) Pre-Pour As-built Survey.
 Boiler Bunker Steel Structure Pedestals (Mill H South-West) Pre-Pour As-built Survey.
 Boiler Bunker Steel Structure Pedestals (Mill H South-West) Pre-Pour As-built Survey.
 Boiler Mill Foundation H (South-West) Curing of Cast Concrete
Boiler Bunker Steel Structure Pedestals (Mill G South-West) Final Rebar Inspection
 Turbine Hall Foundation - (-7.2m EL ) Installation of Bottom layers of Reinforcement
 Turbine Hall Foundation - (-7.2m EL ) Installation of Bottom layers of Reinforcement
 Turbine Hall Foundation - (-7.2m EL ) Installation of Bottom layers of Reinforcement


 Turbine Hall Foundation - (-7.2m EL ) Pile trimming