03.04.2014

 Boiler

 Boiler East

  Boiler East

 Boiler

  Boiler

  Boiler

  Boiler Tripper floor

 Boiler Tripper floor

BC07

 Boiler

 Piperack 5

 Piperack 6

 Bottom Ash TT

 Fabric Filter

 Absorber

 Piperack 4

 GRP phase 5

 GRP phase 5/3

 FGD ducting

 Coal yard

 Stacker reclaimer B

 Piperack 15.2

 BOP

 Industrial waste

 Compressor Building

CMC Ash Conveyor

FGD Dosing skids

No comments: