31.03.2014

 Temporary Chemical cleaning equipment

 Dirty Lub oil Skid

 External polishing Plant

 Piperack 6

 Piperack 15.2

 Main boiler pressure test with DOSH

 SSC east side

Boiler FD/PA fan east side

 Boiler FD/PA fan west side

 Bottom Ash Silo

 Bottom Ash Transfer Tower

 Aeration basin Fan station

 Aeration basin Pump station

Aeration basin 

 Aeration Basin Elec BLD

 Aeration Basin Elec BLD

 Aeration Basin Elec BLD

 GRP phase 5

 GRP phase 3(adjacent to STH)

 MCWPH

 MCWPH

 MCWPH

 MCWPH

 MCWPH

 MCWPH laydown

 MCWPH

 MCWPH

 MCWPH

 MCW Discharge

 MCW Discharge

 Electrochlorination BLD

  Electrochlorination BLD

 MCW pipe

 Coal Conveyor

 Coal Conveyor

 Coal Conveyor

 Coal SRA

 Coal SRB
 Coal yard I/O station

 Coal Yard drainage

 Demin Plant

 Piperack E

 Demin Plant

 Demin Plant

 Demin Plant

 Demin Plant

 Demin Plant

 BOP piperack

 Compressor BLD

 Compressor BLD

 Industrial waste

  Industrial waste

  Industrial waste

 Fly Ash Silo

 Fly Ash pit

 Flt Ash Conveyor

 FGD Ducting

 FGD ID fans & Ducting

 Piperack 9.3

Store BLD