| Power Block (East side) |
| Steam Turbine Hall (East side) |
| Power Block & BOP (Northwest side) |
| Power Block & BOP (Northwest side) |
| Laydown Areas |
| Power Block & BOP (Northeast side) |
| Power Block (Southeast side) |
| Steam Turbine Hall (Southeast side) |
| Steam Turbine Hall (East side) |
| Fabric Filter, FGD and BEB (East side) |
| Fabric Filter, FGD and BEB (West side) |
| Fabric Filter, Power Block, Turbine Hall and CEB (West side) |
| Power Block, Turbine Hall and CEB (West side) |
| Land reclaimation and CW Pipeline |
| MCW & GRP Pipeline |
| Project Offices |
| Project Offices |