| Boiler, FGD Ducts, Booster Fans and FF - Looking Southeast |
| Boiler - Looking Southwest |
| Boiler - Looking Southeast |
| Boiler-Pressure Parts Wall |
| Boiler-Pressure Parts Wall and Pipe Headers |
| Boiler - Coal Piping Installation |
| Boiler - Installation of Vertical Cable Riser (West Side) |
| Boiler-Pressure Parts Wall and Pipe Headers (West Side) |
| Boiler-Pressure Parts Wall and Pipe Headers (East Side) |
| Boiler - LBC Piping Installation (East Side) |
| Boiler - LBC Piping Installation (West Side) |
| Boiler - 100m Level |
| Steam Turbine Hall-ST / GT Table (North Side) |
| Steam Turbine Hall-ST / GT Table (North Side) |
| Steam Turbine Hall (West Side) |
| 4 nos. of MV/LV Transformer CEB - 4m level |
| Delivery of Switchgear to CEB |
| Delivery of Switchgear to CEB |
| Main Transformer Area- Looking East |
| Main Transformer Area - 1st & 2nd GSUT |
| Boiler Electrical Building - Looking South East |
| Fabric Filter - Looking Northwest |
| Fabric Filter - Looking Northwest |
| SWFGD GRP MCW Piping and Saddle Installation |
| Cooling Water Pump House |
| Demin Water Treatment Plant Fdn Works |
| Fly Ash Silo Fdn |
| FGD Area - Looking South |
| FGD Area - Looking North |
| FGD Pipe Rack 4 Fdn |
| FGD Pipe Rack 4 & Electrical Building Fdns |
| Electrical Ducting between Pit 4 and 5 |