| Boiler Backpass Hanger Rods Support Structure and Boiler Walls |
| STH - West side |
| CEB and Piling Works for Pipe Rack 7 |
| Central Electrical Building - Cabling Works @ 0m Level |
| Central Electrical Building - Battery Room @ 10m level |
| Fabric Filter and Piling Works for Coal Handling / BOP Electrical Building |
| Aeration Basin |
| CW Discharge Trench |
| FGD Ducts - Looking Southeast |
| Bottom Ash Silo |
| Fly-Ash Silo |
| Condensate Make up Tank - Looking North |
| Cooling Water Pumphouse |
| Manjung 4 Project |
No comments:
Post a Comment