Boiler Backpass Hanger Rods Support Structure and Boiler Walls

STH - West side

CEB and Piling Works for Pipe Rack 7

Central Electrical Building - Cabling Works @ 0m Level

Central Electrical Building - Battery Room @ 10m level


Fabric Filter and Piling Works for Coal Handling / BOP Electrical Building

Aeration Basin

CW Discharge Trench

FGD Ducts - Looking Southeast

Bottom Ash Silo

Fly-Ash Silo

Condensate Make up Tank - Looking North

Cooling Water Pumphouse