Boiler Backpass Hanger Rods Support Structure and Boiler Walls |
STH - West side |
CEB and Piling Works for Pipe Rack 7 |
Central Electrical Building - Cabling Works @ 0m Level |
Central Electrical Building - Battery Room @ 10m level |
Fabric Filter and Piling Works for Coal Handling / BOP Electrical Building |
Aeration Basin |
CW Discharge Trench |
FGD Ducts - Looking Southeast |
Bottom Ash Silo |
Fly-Ash Silo |
Condensate Make up Tank - Looking North |
Cooling Water Pumphouse |
Manjung 4 Project |