Boiler Backpass Hanger Rods Support Structure and Boiler Walls |
Boiler LBC Piping - 45m level |
STH - ST / Gen Table and Lube Oil Room |
STH - ST / Gen Table and Lube Oil Room |
STH - Roofing Works |
STH - Generator Circuit Breaker @ 8m Level |
Central Electrical Building - Battery Room @ 10m level |
Central Electrical Building - Cabling Works @ 10m level |
Aeration Basin and CW Discharge Trench - Looking Southeast |
Cooling Water Pumphouse |
Fabric Filter - Looking North |
Boiler Electrical Building |
Service / Fire Water Tank foundations & Power Block - East Side |
Bottom Ash Silo |
FGD Area - Southside |
Demin Water Plan |
Fly-ash Silo |
Screening Plant |
Condensate Make up Tank - Looking North |
Land Reclaimation Works |
Manjung 4 - Looking West |
Power Block - Looking Northwest |
Power Block, Fabric Filter & FGD - Looking East |
Aeration Basin - Looking Southeast |