| Boiler - Northwest Side |
| Boiler - Pressure Parts and Walls |
| Boiler - Erection of Coal Piping |
| Boiler Backpass Hanger Rods Support Structure |
| Steam Turbine Hall Roofing Works |
| Steam Turbine Hall - ST/GT Table |
| CEB - Northwest side |
| CEB - Cable Pulling Works in progress - 0m level |
| CEB - Switchgear Installation at 4m level |
| CEB - Cable Installation at 4m level |
| CEB - 10m level |
| Main Transformer Area - Looking South |
| Fabric Filter Plant - Looking North |
| FGD_GRP and MCW pipe looking southeast |
| Aeration basin and Coooling water discharge trench |
| Cooling Water Pumphouse |
| Service/Fire/Potable tank foundation - looking east |
| Demin Water Tanks Foundation |
| Demin Water Plant Foundation |
| FGD Area - Northside |
| FGD - Southside |
| FGD Area - Southside |
| FGD Electrical Building & Piperack Foundation |
| Fly-ash Silo Foundation |
| Screening Plant Foundation |