| FGD, Fabric Filter and Power Block |
| Boiler - Pressure Parts and Walls |
| Boiler Backpass Hanger Rods Support Structure |
| MCW Pipeline from South of Turbine Hall |
| CEB - Cable Pulling Works in progress - 0m level |
| CEB - Switchgear Installation at 4m level |
| MCW and MCW Saddle south of HV Line |
| MCW and GRP Pielines South of HV Line |
| MCW and GRP Pielines South of HV Line |
| Aeration basin |
| Aeration basin |
| CW Discharge Trench |
| Fabric Filter - East Side |
| FGD Area - North Side |
| Service/Fire/Potable tank foundation - looking east |
| Condensate Tank |
| Screening Plant Foundation |