04.06.2012

 Phase2_SWFGD_GRP-North of Chimney - Looking West
 Phase2_SWFGD_GRP-West of Chimney - Looking South
  Boiler Electrical Building - Looking Southwest
  Boiler-Structural Steel-East Side - Looking Southwest
  Boiler-Structural Steel-East Side - Looking East
  Boiler-Structural Steel-West Side-Pre-Installation of Scaffoldings onto the Column - Looking South
Boiler-Structural Steel-East Side - Looking Northwest
Mill A-Sole Plate Grouting - Looking East
 Boiler-Structural Steel-West Side-Erection of First Column - Looking South
Boiler-Eversendai Laydown Area-Assembly of 600T Crane
 Boiler-Cavity Area - Looking South
  Boiler-West Side - Looking South
  Boiler-U/G Electrical Conduit-Electrical Pit #2 and #3 to Mill Side - Looking East
Ash Hopper - Looking East
 Mill Front Side-Backfilling - Looking East
  Steam Turbine Hall - Looking West
  Steam Turbine Hall-East Side - Looking North
  Steam Turbine Hall - Looking Northwest
 Steam Turbine Hall-South Side-Cooling Water Pipe (CWP) Saddle - Looking West
  Steam Turbine Hall - Looking Northeast
  Steam Turbine Hall - Looking Southeast
  Steam Turbine Hall-North Side - Looking East
Steam Turbine Hall-East Side-Scaffolding for 0.00M Lvl Slab - Looking Southwest
  Central Electrical Building - Looking Northeast
 MCW-Beneath New HV Line - Looking North
 SWFGD_GRP-Bet. New HV Line and Aeration Basin-Sheet Piling  - Looking Southeast