07.06.2012

 Phase2_SWFGD_GRP-North of Chimney - Looking West
Phase2_SWFGD_GRP-West of Chimney - Looking South
 Chimney - Looking South
 Boiler Electrical Building - Looking Southwest
  Boiler Area - Looking Southeast
  Boiler-Structural Steel-East Side - Looking Southwest
   Boiler-Structural Steel-West Side - Looking South
 Boiler-Structural Steel - Looking Northeast
  Boiler-Structural Steel - Looking Northwest
  Eversendai-Pre-Fabrication Area - Looking South west
  Eversendai_Assembly of 600T Crane - Looking Northwest
  Boiler Cavity Area - Looking South
   Boiler-West Side - Looking South
 Boiler-North Side-Access for 600T Crane - Looking East
 Ash Hopper - Looking East
Boiler-Cavity Area-Concete Gully - Looking West
  Steam Turbine Hall-East Side - Looking South
 Steam Turbine Hall - Looking Southwest
  Steam Turbine Hall - Looking Northwest
  Steam Turbine Hall-South Side-Cooling Water Pipe (CWP) Saddle - Looking West
 Steam Turbine Hall - Looking Northeast
 Central Electrical Building - Looking Northeast

 MCW-Beneath New HV Line - Looking North
 Reclamation by Aeration Basin - Looking Southeast
Client Tower New HV Line Connecting to Existing Switchyard