26.05.2012

 Panoramic View-Chimney and Phase2_SWFGD_GRP - Looking Southwest
  Panoramic View-Boilera Area - Looking South
  Panoramic View-Boilera Area - Looking East
  Panoramic View-Steam Turbine Hall - Looking West
 Panoramic View-Steam Turbine Hall - Looking North
 Panoramic View-Central Electricial Building - Looking North
 Phase2_SWFGD_GRP-West Side of Chimney- Looking South
 Boiler Electrical Building - Looking Northeast
 Electrical Trench Top Slab-Electrical Pit #6 and #7
 Electrical Trench Top Slab-Electrical Pit #5 and #6
 U/G Electrical Conduit Between Electrical Pit #1 and #2
 Boiler-West Side - Looking North
 Boiler Structural Steel-Installation of the Scaffoldings on to the Column
 Boiler-Structural Steel-East Side - Looking Northwest
 Steam Turbine Hall-East Side - Looking North
 Steam Turbine Hall-South Side - Looking West
 Steam Turbine Hall-North Side - Looking Southeast
 MCW Beneath New HV Line - Looking North
 Phase1_SWFGD_GRP - Looking South
3/5 of Client Tower for New HV Line Looking East