24.05.2012

 Panoramic View-Boiler Area - Looking South
  Panoramic View-Boiler Area - Looking North
  Panoramic View-Boiler Area - Looking East

 Panoramic View-Chimney and Phase1 SWFGD_GRP Area - Looking West

  Panoramic View-Steam Turbine Hall Area - Looking North

Boiler Site Laydown Area - Additional Laydown Area for 600T Crane and Tier 3 Steel
Boiler Site Laydown Area - Prefab of Coal Silos and Ducting
 Phase 2-SWFGD_GRP-West of Chimney - Looking Northeast
 Boiler Electrical Building - Looking Southwest
 Fabric Filter - Looking North
 Boiler Electrical Pit #1 - Looking South
  Boiler Electrical Pit #3 - Looking South
Boiler Electrical Pit #5 to #6-Top Slab - Looking North
 Boiler-Structural Steel-East Side - Looking Southwest
  Boiler-Structural Steel-East Side - Looking Northeast
 Steam Turbine Hall - Looking West
  Steam Turbine Hall-East Side - Looking North
  Steam Turbine Hall-South Side - Looking East
  Steam Turbine Hall - Looking Southeast
 Central Electrical Building - Looking Northwest
 MCW and Phase1 SWFGD_GRP Beneath New HV Line - Looking South
 MCW Beneath New HV Line - Looking North
 Phase1 SWFGD_GRP Beneath New HV Line - Looking North
3/5 Client Tower for New HV Line - Looking East