27.01.2012

Bar Bending Yard -Fabric Filter.

Fabric Filter -Formwork Installation -Pile Caps & Tie Beams -Gridline -6.

F4 Foundation -Type E -Boiler -Steel Fixing -Bottom Layer.

F3 -Boiler -East Side -Curing In Progress.

F2 Foundation -Type F -Boiler -East Side -Steel Fixing Top Layer In Progress.

Mill -C -Steel Fixing -2nd Stage Pour In Progress.

Turbine Hall -2nd Stage Excavation (-2.1MLSD) In Progress.

Turbine Hall -Excavation -2nd Stage (-2.1MLSD).

CEB -Preparation For Lean Concrete (Pile Caps & Tie Beams).

CEB -Preparation For Lean Concreting.(Pile Caps & Tie Beams)