22.08.2011

Concreting To Pile # B100 -1000mm dia.

Installation Of Bentonite Mixer Pumps -Synohydro.


Proposed Silt Trap Area.


Formwork -Ground Beams -Consortium Office.


Steel Fixing -Bore Pile Cage.



Installation Of Steel Cage -Pile # A23.


Boring To Pile # A29 -1000mm dia.

Installation Of Steel Cage -Pile # B100 -1000mm dia.


Ground Beam Preparations -Consortium Site Office.