04.08.2014

Boiler - North Side

Fabric Filter - West Side

Manjung 4

Bottom Ash Silo Conveyor

Coal Conveyors

Fly Ash Silo

Turbine Hall - 0m Level

Turbine Hall - 0m Level

Coal Transfer Towers

Coal Transfer Towers Electrical Building

Coal Transfer Towers Electrical Building

Coal Transfer Towers Electrical Building

Coal Transfer Towers Electrical Building

Coal Conveyors

Cooling Water Intake

Cooling Water Intake

Cooling Water Intake

Cooling Water Pumphouse

Cooling Water Pumphouse

Cooling Water Pumphouse

Cooling Water Pipe Line

Electrochlorination Building

Electrochlorination Building

Electrochlorination Building


Stacker Reclaimer A

Coal Yard - Base Coal Layer

Coal Yard - Base Coal Layer

Manjung 4
Ash Conveyor to CMC 5-year Ash Pond
 
CMC 5-year Ash Pond

01.08.2014

 
MCWPH intake
Base coal
Base coal
Base coal
Base coal
Base coal
Base coal
MCW intake channel
MCW intake channel
MCWPH view from top
MCW intake channel view from top
FGD north view
FGD south view
FGD duct west view
Duct between FF and Boiler west view
Duct between FF and Boiler east view
Coal handling and BOP electrical building
Fabric Filters roof top
Coal handling and BOP electrical building
Boiler cavity
Boiler FD fans east side
Boiler Fire fighting piping at 25.0m level
Boiler Fire Fighting piping
Boiler tripper floor
Boiler tripper floor
Coal conveyor belt at Boiler tripper floor
Boiler sootblower
Boiler entrance to tripper floor
Boiler
CO2 tank
Bottom ash conveyor structure
Bottom ash silo
Conveyor BC-06 and transfer towers
Transfer tower TTS-13
Stacker reclaimer A
Coal yard P1
Stacker reclaimer B
Store building
Demin plant
Service and fire water tanks
GRP Phase 5.3
Industrial waste water treatment