MCWPH intake |
Base coal |
Base coal |
Base coal |
Base coal |
Base coal |
Base coal |
MCW intake channel |
MCW intake channel |
MCWPH view from top |
MCW intake channel view from top |
FGD north view |
FGD south view |
FGD duct west view |
Duct between FF and Boiler west view |
Duct between FF and Boiler east view |
Coal handling and BOP electrical building |
Fabric Filters roof top |
Coal handling and BOP electrical building |
Boiler cavity |
Boiler FD fans east side |
Boiler Fire fighting piping at 25.0m level |
Boiler Fire Fighting piping |
Boiler tripper floor |
Boiler tripper floor |
Coal conveyor belt at Boiler tripper floor |
Boiler sootblower |
Boiler entrance to tripper floor |
Boiler |
CO2 tank |
Bottom ash conveyor structure |
Bottom ash silo |
Conveyor BC-06 and transfer towers |
Transfer tower TTS-13 |
Stacker reclaimer A |
Coal yard P1 |
Stacker reclaimer B |
Store building |
Demin plant |
Service and fire water tanks |
GRP Phase 5.3 |
Industrial waste water treatment |
No comments:
Post a Comment