21.05.2014

 MNGIV west side

 STH 16m lvl

  STH 16m lvl

STH - Steam blow pipe

 Boiler

 Boiler 33m lvl

 Boiler 33m lvl

 Boiler Tripper floor

 Boiler east

 Boiler Tripper floor

Boiler 0m lvl SSC

 Bottom Ash TT & Conveyor

 Fabric Filter southeast

 Fabric Filter south

 ID Fan B

 Fuel Oil Station

 Piperack 6
 Industrial waste Basin

 Aux Steam line from MNG123

 MCW pipe north of STH

 Coal TT 10
 Coal TT 10

 Coal crusher house

 Coal Yard

 Cola conveyor BC06

Coal TT13

14.05.2014




STH Level 16.0m

STH Level 16.0m

STH Level 0.0m

STH Level 0.0m

STH Level 16m ST Valve

STH Annex and Roof

STH Steam Blow piping

STH Steam Blow preparation

CEB Control Room

CEB Engineering Room

Transformer area

Boiler cavity




FGD duct

FGD duct
Air compressor plant
 
Piperack 15.1
Bottom ash conveyor
Service and Fire Water tanks
Industrial waste water treatment

GRP Phase 5.5

Conveyor BC-06
Crusher House

GRP Phase 2




13.05.2014

MNG4 south view

MNG4 south view

Boiler south view

STH and CEB south view

CEB south view

Client coal yard

Client HV Switchyard

Client HV Switchyard

Transfer towers

Transfer tower TTS13

Stacker reclaimer A

Stacker reclaimer B

Piperack 15.2

Piperack 14

Aeration basin

Aeration basin

Coal yard run-off basin

Demin plant

Fuel oil pump house

MCWPH

MCWPH steel structure

Electrochlorination plant

MNG4 east view

MNG4 east view