14.05.2014




STH Level 16.0m

STH Level 16.0m

STH Level 0.0m

STH Level 0.0m

STH Level 16m ST Valve

STH Annex and Roof

STH Steam Blow piping

STH Steam Blow preparation

CEB Control Room

CEB Engineering Room

Transformer area

Boiler cavity




FGD duct

FGD duct
Air compressor plant
 
Piperack 15.1
Bottom ash conveyor
Service and Fire Water tanks
Industrial waste water treatment

GRP Phase 5.5

Conveyor BC-06
Crusher House

GRP Phase 2