13.10.2014

FGD north view
ID fans
Fabric filters roof view
FD fan west side
FD fan east side
Coal handling and BOP electrical building
Condensate make-up tank
STH Level 16.0m
STH Level 16.0m
STH Lube oil room
STH annex
STH roof top
STH south view
CEB south view
CEB 1st floor
CEB 1st floor
CEB 2nd floor
CEB 3rd floor
CEB control room
CEB Engineering room
Boiler east view
Boiler west view
Boiler south view
CO2 tank
Coal yard I/O station
Boiler north view
FD fan east side
Boiler cavity
N2/CO2 gas bottles
Boiler corridor
Boiler
Boiler
STH annex
Boiler tripper floor rooftop
Boiler tripper floor
Boiler tripper floor
Boiler
Coal handling & BOP electrical building roof view
Coal transfer towers
Coal conveyors BC-06 & BC-07
Stacker reclaimer A
Stacker reclaimer B
Coal handling control building
Coal run-off basin
GRP Phase 5
Fly ash silo
Fly ash silo
Air compressor station
Air compressor station
Bottom ash conveyor
Sanitary wastewater treatment plant
Warehouse building east view
Warehouse building south-west view
Warehouse building internal view
Industrial wastewater treatment plant
Industrial wastewater treatment plant
Industrial wastewater treatment plant
Industrial wastewater treatment plant
Oil water separator
Storage and Demin tanks
Service & Fire water storage tanks
Demin plant
FGD aeration basin
FGD aeration basin
FGD aeration basin
Aeration basin
CW discharge channel
Aeration basin
Electrochlorination building
Electrochlorination building ground floor
Electrochlorination building ground floor
MCWPH
MCWPH internal view
MCWPH drum screens
MCWPH trash rake
MCWPH intake
Plant road preparation
Plant road preparation