| Manjung 4 - Viewed from Northwest |
| Manjung 4 - Coal Yard |
| Manjung 4 - East Side of Plant |
| Boiler and Ash Conveyor |
| Boiler Cavity |
| Boiler - Coal Conveyor to Tripper Floor |
| Boiler - 78m Level |
| Fabric Filter |
| Aeration Basin |
| GRP Pipeline |
| Fabric Filter and FGD |
| ID Fan |
| Ash Silos |
| Waste Water Treatment |
| Cooling Water Intake |
| Cooling Water Intake Pumps |
| Backfill of MCW Pipes at Pump House |
| Storehouse Interior |
| Stacker Reclaimer A |
| Arrival of Dosing Chemicals at Chlorination Plant |
No comments:
Post a Comment